Dongara (Port Denison) Boat Harbour

Case Study
WA Limestone was responsible for the construction of 2 separate 400 metre seawalls, which included the supply, transport and installation of approximately 300,000 tonnes of limestone core and granite armour.

Dongara (Port Denison) Boat Harbour Development

WA Limestone was responsible for the construction of 2 separate 400 metre seawalls, which included the supply, transport and installation of approximately 300,000 tonnes of limestone core and granite armour.

  • Client

    State Government

  • Location

    Dongara

  • Duration

    1979-80

  • Value

    $6M