Mandurah Bridge
Case Study
In 2017, WA Premix, played a pivotal role in the construction of the new Mandurah Traffic Bridge by supplying concrete required for the pivotal project.

Mandurah Traffic Bridge Development
The new bridge, which replaced the original structure, features four traffic lanes and a five-meter-wide pedestrian and cyclist walkway, significantly improving traffic flow and safety in the region.
WA Premix’s Mandurah plant was instrumental in delivering high-quality concrete solutions tailored to the project’s specifications, ensuring structural integrity and durability. Their contribution was essential to the successful completion of this key infrastructure development, enhancing connectivity and supporting the growth of the Mandurah community.
- Cilent
State Government
- Location
Mandurah
- Duration
2017-18