Mandurah Bridge

Case Study
In 2017, WA Premix, played a pivotal role in the construction of the new Mandurah Traffic Bridge by supplying concrete required for the pivotal project.

Mandurah Traffic Bridge Development

The new bridge, which replaced the original structure, features four traffic lanes and a five-meter-wide pedestrian and cyclist walkway, significantly improving traffic flow and safety in the region.

WA Premix’s Mandurah plant was instrumental in delivering high-quality concrete solutions tailored to the project’s specifications, ensuring structural integrity and durability. Their contribution was essential to the successful completion of this key infrastructure development, enhancing connectivity and supporting the growth of the Mandurah community.

  • Cilent

    State Government

  • Location

    Mandurah

  • Duration

    2017-18